Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Swedetown Road - RRR and Drainage Improvements
Infrastructure
Bidding
$2,000,000 est. value
Theodore, AL 36582

Lowe House - Grounds, Drainage, and Pavement Repairs and Improvements
Post-Bid
Huntsville, AL 35899

2019 Miscellaneous Drainage Repairs (Group A)
Post-Bid
Mobile, AL

Constructing the Drainage Improvements (Grading, Drainage, Pavement, and Traffic Stripe)
Results
$542,757 to $663,370 est. value
Midfield, AL 35228

RESTORE - Phillips Restore Project - Mobile, Alabama
Results
$250,000 to $500,000 est. value
Mobile, AL

BayPointe Hospital Retaining Wall
Alteration
Construction
Mobile, AL 36693

Delta Port Parking Lot and Shoreline Improvements
Post-Bid
Dauphin Island, AL

18/36 Runway Edge Dams
Results
Mobile, AL

12 Mile Creek Headwater Restoration Project
Post-Bid
Mobile, AL

Walker Street Drainage Improvements
Results
$50,000 to $75,000 est. value
Gadsden, AL 35902

Drainage and Roadway Improvements for the Roadway Improvements for Atchison Parkway
Post-Bid
Chelsea, AL

Berth 2 Fender Repairs From M/V Maxx B. Allision
Results
Mobile, AL 36602

Fire Station Two Water and Drain Line Upgrades
Post-Bid
Talladega, AL

Reported 04/01/2022 12:00 AM
Project Title

Site Improvements at Pinedale, Holly Hill Elementary Schools and Dauphin Junior High School

Physical Address View project details and contacts
City, State (County) Enterprise, AL 36330   (Coffee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 03/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work to include a new retaining wall and stairs, grading and erosion control at Pinedale Elementary, drainage improvements and erosion control at Holly Hill Elementary, and a new parking lot at Dauphin Jr. High School.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents