Similar Projects
Reported | 04/16/2021 12:00 AM |
Project Title | Long Avenue Water and Sewer Improvements |
Physical Address | View project details and contacts |
City, State (County) | FL 32456 (Gulf County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of a new sewage lift station constructed near the intersection of First Street on Langston Drive. The new duplex submersible pump station will be capable of pumping 1,000 gallons per minute (gpm) at 40 feet of head and will replace the existing station known as the First Street Station. Temporary bypass pumping will be required for construction of a new 21-inch diameter gravity sewer from the existing station to the new. Restoration will include asphalt roadway construction, concrete sidewalks, sodding and grassing. The existing dry pit-wet pit station will be demolished following commissioning of the new station. This project will also include rehabilitation of gravity sewer, manholes, and laterals on Long Avenue using the Cure-In-Place-Pipe (CIPP) method. Replacement of approximately 4,000 LF of existing force mains with 12 PVC force main is also included from 5th Street to 16th Street and approximately 11,000 LF of 10 water main from 1st Street to the Middle School. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |