Similar Projects
Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Post-Bid
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

CR 95A and Old Chemstrand Road Intersection Improvements
Post-Bid
Pensacola, FL 32502

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

Milling and Resurfacing/Drainage Improvements/Traffic Signals (BDI)
Results
Less than $567,086 est. value
FL

Intersection Improvements in Plant City, Lithia, and Riverview Areas
Post-Bid
$3,901,420 est. value
Lithia, Plant City, Riverview, FL

FY 2020 Street Rehabilitation
Results
Less than $1,271,736 est. value
Pensacola, FL 32502

Spring Street Road Diet Main Street to Cervantes Street
Results
Pensacola, FL 32502

Langley Avenue Roundabout
Results
Pensacola, FL

Osceola Golf Course Cart Path
Results
Less than $249,308 est. value
Pensacola, FL 32506

17-18 Resurfacing Project
Results
Less than $3,500,000 est. value
FL

19-20 Road Resurfacing Project
Results
Less than $3,000,000 est. value
FL

Muscogee Road Resurfacing Jacks Branch to Nowak
Results
FL

Add Left Turn Lane(S)/Base Work/Drainage Improvements
Results
Less than $1,289,820 est. value
FL

Ashcraft Road Dirt Road Paving
Results
FL

Safety Project/Add Turn Lanes/Traffic Signals/Drainage Improvements
Results
Less than $265,041 est. value

Last Updated 12/30/2020 09:18 AM
Project Title

Pensacola Beach Access Road Improvements

Physical Address View project details and contacts
City, State (County) FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Pensacola Beach Master Plan - Access Roadway Improvements Project is a roadway upgrade project located on Pensacola Beach. The project includes demolition and debris removal, utility relocation, shifting the alignment of a portion of Pensacola Beach Boulevard to the west, extending and resurfacing the existing service roadway from Bob Sikes Bridge to the Quietwater Beach Restrooms, driveway relocation, construction of new improved parking at Quietwater Beach, extension of the existing multi-use path, stormwater runoff improvements, pedestrian access, the relocation of lighting and transformers within the right-of-way, and the milling and resurfacing of a portion of Pensacola Beach Boulevard.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents