Similar Projects
Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Street Improvements Project - Phase 4
Infrastructure
Post-Bid
Highland Village, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Bruton Orand Boulevard at FM 1171 - Right Turn Lane
Results
$252,742 est. value
Flower Mound, TX 75028

Presidium - Frisco Square
New Construction, Infrastructure
Construction
$60,000,000 CJ est. value
Frisco, TX 75033

Presidium - Frisco Square
New Construction, Infrastructure
Construction
$60,000,000 CJ est. value
Frisco, TX 75033

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Linden Hills Phase 3 - Clearing and Grading
Infrastructure
Post-Bid
Little Elm, TX

Aquatic Center Parking Addition
Results
$411,829 est. value
Little Elm, TX 75068

Velvet Taco - Grandscape
New Construction, Infrastructure - 2,388 SF
Construction
$1,000,000 CJ est. value
The Colony, TX 75056

Last Updated 12/06/2022 04:54 AM
Project Title

Cliff Oak Drive - City of Corinth

Physical Address View project details and contacts
City, State (County) Corinth, TX 76210   (Denton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2028
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the reconstruction of a two lane asphalt facility to a collector. The collector will be constructed of concrete and have a curb and gutter underground drainage system and concrete sidewalks. As of December 06, 2022, this project is currently in the FY 2023 - 2038 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents