Similar Projects
Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Huckleberry Campground Electrical Phase 2
Renovation, Addition, Infrastructure
Design
Less than $500,000 est. value
Calder, ID

Fish Lake Complex-Phase 1-Doctor Creek Project
Infrastructure
Bidding
$5,000,000 CJ est. value
Salmon, ID 83467

Spring Valley Wells No.1 & No.2 with Booster
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Meridian, ID 83642

FY23 D3 Interstate Striping
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Boise, ID 83716

I-86, FY22 Fence Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Boise, ID 83702

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Post-Bid

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Roadside and Pond Herbicide Services
Alteration
Results
$245,000 est. value
ID

New Football Field - Coeur d'Alene High School
Infrastructure
Pending Verification
$1,375,000 CJ est. value
Coeur D Alene, ID 83815

Sweetwater Townhouses Phase II of Block 2
New Construction, Infrastructure - 5,982 SF
Pending Verification
$30,000,000 CJ est. value
Hailey, ID 83333

Ross Point Phase 2
New Construction, Infrastructure
Design
$250,000 to $500,000 est. value
Post Falls, ID 83854

Jerome County Readiness Center
LEED Certification, New Construction, Infrastructure - 54,624 SF
Bidding
$18,400,000 CJ est. value
Jerome, ID 83338

Idaho Falls Clearance Tree Trimming Bid
Alteration
Post-Bid
Idaho Falls, ID

Last Updated 07/26/2022 07:31 PM
Project Title

Crown Pointe Mass Grading Project

Physical Address View project details and contacts
City, State (County) Post Falls, ID 83854   (Kootenai County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation, Park/Playground, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value $312,440 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mass grading and final grading of Crown Pointe Park, modify irrigation system, erosion and sediment control, and seeding of disturbed areas. A bid guaranty of 5 percent of the bid amount is required. Separate performance and payment Bonds each in the amount of 100 percent of the contract amount will be required. Each bidder must Supply all the information required by the bid documents and specifications. This Project is not financed by Federal Aid Funds. All contractor, subcontractor, or specialty contractor shall be required to have a current license as a Public Works Contractor in the State of Idaho in order to submit a bid or proposal on this project. The City, in accordance with Title VI of the Civil Rights Act of 1964, 78 stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all applicants that it will affirmatively ensure that in any contract entered into pursuant to the advertisement, disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity to submit offers in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. All prospective bidders are directed to the Instructions for Bidders for discussion of Bid policies, procedures, and requirements. The Owner reserves the right to reject any and all Bids, to waive any and all informalities and to negotiate contract terms with the successful Bidder, and the right to disregard all non-conforming, non-responsive or conditional Bids. All questions shall be directed to Bryan Myers at the City of Post Falls, (208) 773.8147, bmyers@postfallsidaho.org Work associated with the proposed project is generally described as follows: Schedule A - Mass grading and final grading of Crown Pointe Park, modify irrigation system, erosion and sediment control, and seeding of disturbed areas.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents