Similar Projects
Engineering North Addition Phase I - San Diego State University
Addition, New Construction, Infrastructure - 79,000 SF
Conception
$10,270,000 CJ est. value
San Diego, CA 92101

Life Sciences North Replacement - San Diego State University
New Construction - 77,000 SF
Conception
$162,063,000 CJ est. value
San Diego, CA 92182

Birch Aquarium Expansion - University of California, San Diego
Renovation
Design
$30,000,000 CJ est. value
La Jolla, CA 92037

Community Learning Center Campus (CLC) Parking Lot Phase II and Building C Demolition Project
Demolition, Infrastructure
Design
$2,300,000 CJ est. value
Oceanside, CA 92054

OC2100 Photo Lab Mechanical Improvements
Renovation
Bidding
$175,000 CJ est. value
Oceanside, CA 92056

RFQ Contractor - Pepper Canyon West Student Housing
Renovation
Post-Bid
$200,000 est. value
San Diego, CA 92093

RFP Construction Manager at Risk - Shiley Eye Institute Renovation
Renovation
Post-Bid
$17,000,000 CJ est. value
San Diego, CA 92037

Southwestern Community College District Instructional Complex 1
Renovation
Results
$600,000 est. value
Chula Vista, CA 91910

Southwestern College Jaguar Village
New Construction
Results
Chula Vista, CA 91910

California State University San Marcos Dual Elevator
Renovation
Post-Bid
$3,500,000 est. value
San Marcos, CA 92096

Miscellaneous Enhancements
Renovation
Results
$680,000 est. value
Encinitas, CA 92007

Construction Manager - LL Remodel and Athletics Complex Projects
New Construction, Renovation - 20,000 SF
Post-Bid
$37,000,000 est. value
Fallbrook, CA

Pepper Canyon Hall 2nd Floor EDI and Transfer Center Renovation
Renovation
Results
$300,000 est. value
San Diego, CA

Urey Hall EGAP
Renovation
Post-Bid
$15,000,000 est. value
San Diego, CA 92037

RFQ Contractor - York Hall EGAP
Renovation
Results
$485,249 CJ est. value
San Diego, CA 92161

Last Updated 09/29/2022 07:01 AM
Project Title

Sverdrup Hall - Exterior Tile and Sunshade Installation

Physical Address View project details and contacts
City, State (County) San Diego, CA 92037   (San Diego County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $847,755 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents