Similar Projects
Fox College Parking Lot & Detention Addition
Conception
Tinley Park, IL

Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

George Washington High School
Renovation
Bidding
$500,000 est. value
Chicago, IL 60617

Joliet Avenue Rehabilitation
Infrastructure
Bidding
$3,000,000 est. value
McCook, IL

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Old Orchard Junior High School - Corridor Code Compliance - BP #1 - General Trades
Results
Skokie, IL 60076

Interior Renovation at Hyman G Rickover Naval Academy High School
Renovation
Results
Chicago, IL 60634

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Renewable Energy & Urban Farming Campus
New Construction - 13,000 SF
Construction
$36,000,000 est. value
Chicago, IL 60661

Oak Forest High School Welding Shop Alterations
Renovation
Bidding
$250,000 est. value
Oak Forest, IL 60452

Maine South High School
Post-Bid
Park Ridge, IL

Grand Avenue School Second Floor Office Renovation
Renovation
Results
Western Springs, IL 60558

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

2021 Summer Work
Renovation, Addition
Post-Bid
Winnetka, IL 60093

Last Updated 04/27/2022 09:54 AM
Project Title

2022 and 2023 Referendum Work - Remodeling at Multiple Sites - Intermediates (Glen Grove, Hoffman, Pleasant Ridge)

Physical Address View project details and contacts
City, State (County) Glenview, IL   (Cook County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Packages for this project include: BP #1 – Sitework & Structural BP #2 – Masonry BP #3 – General Trades BP #4 – Flooring & Tile BP #5 – Fire Protection BP #6 – Plumbing BP #7 – HVAC BP #8 – Electrical

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents