Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

The Boulevard
New Construction - 63,500 SF
Conception
Navarre, FL 32566

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Dwell at Oviedo - Phases 1A and 1B
New Construction
Design
Oviedo, FL

Sunset Cove
New Construction - 44,357 SF
Bidding
$10,000,000 CJ est. value
Davenport, FL 33897

Design-Build Services for Center for Active Aging
New Construction - 20,000 SF
Sub-Bidding
Less than $12,061,143 est. value
Deerfield Beach, FL

The Reserve at Jensen Beach
New Construction
Post-Bid
$21,250,000 est. value
Jensen Beach, FL 34957

Orange Avenue Apartments
New Construction, Demolition
Post-Bid
$11,000,000 est. value
Tallahassee, FL

Community Center
- 5,000 SF
Results
Astatula, FL

Grande Palms at Tradition - Phases l and ll
New Construction - 25,950 SF
Construction
$14,000,000 est. value
Port Saint Lucie, FL 34953

Abacoa Chabad Jewish Center
New Construction - 23,000 SF
Construction
$3,823,130 est. value
Jupiter, FL 33458

Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

Mandala Village - Master Plan
New Construction
Design
Vero Beach, FL 32967

Shore Acres Recreation Center Replacement
New Construction, Demolition - 20,000 SF
Post-Bid
$7,700,000 est. value
Saint Petersburg, FL

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

Reported 06/02/2021 04:14 PM
Project Title

Construction Manager at Risk (CMAR) Services - Teen Enrichment Center

Physical Address View project details and contacts
City, State (County) Leesburg, FL 34748   (Lake County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced May 2021
Bids Due View project details and contacts
Estimated Value $2,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Construction Manager at Risk (CMAR) services for the City's Teen Enrichment Center. The new facility is expected to be 10,000 square feet and be located adjacent to the City's existing Gymnasium located at 1851 Griffin Road, Leesburg, Florida 34748.

Details

1 Misc. Recreational, Approximately 10,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents