Similar Projects
Project #7289 Cabana Ln - Sailmaker Ln Construction / Plano Streets Project
Infrastructure
Design
Plano, TX

Screening Wall Replacement - Parkwood/Nassau/Willow Bend - 37876 - City Of Plano
Alteration
Design
$4,500,000 est. value
Plano, TX 75074

2023 Pavement Preservation Package 7 - Flatwork and Street Improvements TOC
Infrastructure
Bidding
$2,000,000 est. value
San Antonio, TX

Mesa St. and Texas Ave. Stormwater Main Replacement
Infrastructure
Bidding
$200,000 est. value
El Paso, TX 79901

Roadway Construction to Serve Sienna Village of Destrehan Section 1
Post-Bid
$800,000 est. value
Missouri City, TX

Seal Coat
Post-Bid
TX

SRT Frontage Road Pavement Rehabilitation
Results
$914,435 est. value
TX

Paving and Appurtenances to Serve Escondido Section 1 and Section 2
Results
Katy, TX

McKinney Avenue/Cole Two-Way Conversion
Post-Bid
Dallas, TX 75295

Adolph Thomae JR County Park Roadway and Parking Improvements
Results
$211,726 est. value
Brownsville, TX

Kiber Reserve - Section 2
Infrastructure
Post-Bid
Angleton, TX

Harvest Ridge Section One - Streets, Drainage, Water and Wastewater Improvements
Results
Elgin, TX

Paving Facilities to serve Tradition, South Phase 4B
Infrastructure
Post-Bid
TX

Fredericksburg Road (N. Flores St. to W. Woodlawn Ave)
Results
$5,800,000 est. value
San Antonio, TX 78200

Paving Facilities to Serve Harvest Phase 14 and 15
Infrastructure
Post-Bid
Northlake, TX 76226

Reported 07/12/2022 12:00 AM
Project Title

2022 Asphalt Overlay Project at Harrold

Physical Address View project details and contacts
City, State (County) Vernon, TX   (Wilbarger County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Wilbarger County will be accepting bids for the 2022 Asphalt Overlay Project at Harrold. Project is generally described as the rehabilitation of various asphalt streets, and associated work. The location of the projects is Stewart Street, Harrold, Texas and Harrold Lane. Stewart Street Total length - 2085 feet - 36 feet wide for 480 feet and 20 foot wide for 1605 feet. Harrold Lane Total length for 1365 feet. 23 feet for 118 feet and 20 feet wide for 1247 feet. The product will be 2 of compacted HMAC accordance to TXDOT specifications. Contact Josh Patterson for any more information at 940- 839-5204. Sealed Bids will need to be marked Harrold Bid and turned in at the Wilbarger County Judges office at 1700 Wilbarger Street, Room 12, Vernon, Texas at or before 9:00 AM on July 11, 2022. Bids will be opened at 9:15 on July 11, 2022 during Commissioners Court. Wilbarger County reserves the right to refuse any and all bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents