Similar Projects
Hai Key Creek Lift Station Phase 3 Force Main - Construction - HC1802 - City of Broken Arrow
Renovation
Conception
$561,360 est. value
Broken Arrow, OK

South Park South Lift Station Conversion(Construction) - 2254360 - City of Broken Arrow
New Construction, Infrastructure
Conception
$606,000 est. value
Broken Arrow, OK

Oklahoma Electric Cooperative Pump House for Fire/Water Lines
New Construction, Infrastructure - 230 SF
Design
$250,000 CJ est. value
Norman, OK 73069

Wastewater Treatment Plant Improvements
Renovation
Bidding
$36,857,500 CJ est. value
Newcastle, OK 73065

Hwy 97 Lift Station Rehabilitation
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Sand Springs, OK 74063

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Villas on the Green Lift Station Conversion
New Construction
Post-Bid
$180,000 est. value
Broken Arrow, OK 74011

Perkins Lift Station Replacement
Renovation
Results
Perkins, OK 74059

Sanitary Sewer Lift Station
Infrastructure
Results
$310,000 est. value
Stigler, OK

New 300 gpm Iron and Manganese Water Treatment Plant, Backwash Lagoons and Water Well
Infrastructure
Bidding
$60,000 CJ est. value
Garber, OK 73738

Rmua Haikey Creek Lift Station Phase 4 Improvements Project
Renovation
Post-Bid
$400,000 CJ est. value
Tulsa, OK 74103

Wastewater Treatment Improvements Interpak Extension
Renovation, Infrastructure
Results
Muskogee, OK

Birdtail Addition
New Construction, Addition
Post-Bid
$2,000,000 est. value
Tahlequah, OK 74464

Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Lift Pump Station - INT 01 Project
Renovation
Results
Edmond, OK

Infrastructure Improvements for the 60-acre Community Development
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Okemah, OK 74859

Last Updated 06/27/2023 03:06 PM
Project Title

2022 ORWA RIG Water System Improvements

Physical Address View project details and contacts
City, State (County) Roosevelt, OK 73564   (Kiowa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $255,450 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of one of the three municipal water well pumps and telemetry between the two municipal water towers and the three municipal water wells as well as the replacement of altitude valves and the installation of insertion valves.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents