Project Title | The Seattle Public Library Green Lake Branch URM Seismic Upgrade and Renovation |
Physical Address | View project details and contacts |
City, State (County) | Seattle, WA 98115 (King County) |
Category(s) | Government/Public, Green Building, Heavy and Highway |
Sub-Category(s) | LEED Certified, Library - Public, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,577,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project is a structural upgrade and renovation of an existing 2-story concrete and unreinforced masonry building including renovated staff areas, seismic upgrades, and accessibility improvements including a new elevator. Scope involves replacement of the existing HVAC and fire alarm systems; modification to the plumbing, fire sprinkler service, and electrical systems; structural upgrades including shotcrete walls and steel moment frames; replacement of existing elevator; excavation and site improvements for accessibility upgrades; and low-voltage and security improvements in coordination with the Owner's vendors. The building is a designated Seattle landmark. The project is pursuing LEED Gold certification. A/E ESTIMATE: $4,627,000 (BASE BID) The building will be closed during construction; refer to project documents for requirements. For purposes of the Inclusion Plan, this is considered a facility type of project with a Past Performance of 25% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan, please contact Miguel Beltran at Miguel.Beltran@seattle.gov or 206-684-4525. Back-up contact is Carmen Kucinski at Carmen.Kucinski@seattle.gov or 206-684-0188. Bidders must understand the requirements of SMC 14.16 and RCW 49.46 and demonstrate compliance prior to award. All questions must be submitted in writing to the architect, attention: Michele Hill at michele@buildingwork.design before 5:00 PM on Tuesday, November 1, 2022. Substantial Completion: 334 Calendar Days ; Final Completion 30 Calendar Days following Substantial Completion |
||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, Renovation, Renovation.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |