Similar Projects
Michael Driscoll School Project - Filed Sub Bids
New Construction - 157,950 SF
Results
$92,800,000 est. value
Brookline, MA 02446

Tappan Gym and High School Third Floor Renovations - General Bids
Renovation
Results
Less than $9,788,108 est. value
Brookline, MA

High School Project Management
Post-Bid
$10,000,000 to $20,000,000 est. value
Walpole, MA 02081

Thayer Academy
New Construction, Renovation
Pending Verification
$64,755 est. value
Braintree, MA

Sharon High School - Filed Sub Bids
New Construction - 240,204 SF
Results
$125,351,000 est. value
Sharon, MA 02067

Needham High School Locker Room Reconfiguration
Results
Less than $50,000 est. value
Needham, MA

Roxbury Prep Washington Street Campus Alterations
Renovation
Bidding
$100,000 est. value
Boston, MA 02119

Project F Deferred Maintenance - Brookline High School Expansion - Filed Sub Bids
Results
$3,211,928 est. value
Brookline, MA 02445

Sparhawk Academy
New Construction
Pending Verification
Millis, MA

Project F Deferred Maintenance - Brookline High School Expansion - General Bids
Results
$3,211,928 est. value
Brookline, MA 02445

Tappan Gym and High School Third Floor Renovations - Filed Sub Bids
Renovation
Results
Less than $9,788,108 est. value
Brookline, MA 02445

Disaster Recovery Services
Results

Maria Weston Chapman Middle School
Post-Bid
Less than $128,100,000 est. value
Weymouth, MA 02189

Project Manager - Coakley Middle School
Results
$86,000,000 to $100,000,000 est. value
Norwood, MA

Owner's Project Manager
Post-Bid
$90,000,000 to $120,000,000 est. value
East Walpole, MA

Last Updated 09/18/2020 10:38 AM
Project Title

Wellesley Middle School Building Systems - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Wellesley, MA 02482   (Norfolk County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents