Similar Projects
I Luv Pho Roswell
Renovation - 5,200 SF
Conception
Roswell, GA 30076

Cusseta Travelers Center
New Construction - 10,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Cusseta, GA 31805

Encore Commons
New Construction - 17,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Arby`s
Renovation - 3,110 SF
Design
Eatonton, GA 31024

Chick-Fil-A Restaurant #0817
Renovation
Bidding
Dalton, GA 30720

Culver's Restaurant
New Construction - 4,330 SF
Bidding
Sharpsburg, GA

Panda Express
Renovation - 750 SF
Sub-Bidding
$430,333 est. value
Robins Afb, Robins Air Force Base, GA 31098

Cook Out
New Construction, Demolition - 1,554 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
La Grange, GA 30240

Zaxby's
New Construction - 2,622 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Sylvester, GA 31791

New East Laurens High School Campus and Football Stadium - CM at Risk Services
New Construction
Results
Less than $34,000,000 est. value
Dublin, GA

Glynn County Stadium Press Box
New Construction
Results
Brunswick, GA 31520

Plant Riverside
New Construction, Renovation - 26,000 SF
Construction
$250,000,000 est. value
Savannah, GA 31401

GlenCastle
Renovation - 63,660 SF
Construction
$15,000,000 est. value
Atlanta, GA 30316

Dunkin
Renovation - 1,900 SF
Pending Verification
Atlanta, GA 30316

Grand Champion BBQ
New Construction
Pending Verification
Suwanee, GA 30024

Last Updated 09/22/2021 09:01 AM
Project Title

Concessions and Restroom Facility and Other Improvements to the Poplar Springs Baseball Complex

Physical Address View project details and contacts
City, State (County) Ringgold, GA 30736   (Catoosa County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Food/Beverage Service, Stadium
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,601,140
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of providing all materials, appurtenances and labor to construct a single level, 2,357 sq. ft. concrete block restroom & concession building & approximately 45,000 sq. ft. concrete plaza in the center of an existing 5 ball field hub, fence replacement for five fields, field re-grading and improvements, site irrigation, and installation of site storm drainage system.

Details

Stadium, New Construction, 1 Food/Beverage Service, 2,357 SF New Construction.
Division 01 - General Requirements, Site Construction Performance Requirements, Site Improvements Performance Requirements.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Site Improvements, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents