Similar Projects
39th Street Reconstruction - 11th to 12th Avenue - MFT 280 - City of Moline
Infrastructure
Conception
$560,000 CJ est. value
Moline, IL 61265

39th Street Reconstruction - 11th to 12th Avenue - MFT 280 - City of Moline
Infrastructure
Conception
$560,000 CJ est. value
Moline, IL 61265

RINC Fiber Optics Upgrades
Infrastructure
Design
$500,000 CJ est. value
Rock Island, IL 61201

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Engineering Services for 30th Street Resurfacing
Infrastructure
Post-Bid
Rock Island, IL 61201

2022 Joint and Crack Sealing Program
Infrastructure
Results
Moline, IL

2022 City-Owned Lots and Surface Road Maintenance Program
Infrastructure
Results
Moline, IL

Third Street New Commercial Development
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
East Moline, IL 61244

Road Diet - Morgan Park Phase 1 - 1343 - City of Moline
Infrastructure
Conception
$429,525 CJ est. value
Moline, IL 61265

Engineering Services for 31st Avenue Resurfacing
Infrastructure
Post-Bid
Rock Island, IL

Ravine Sanitary Sewer Access Roads (Phase 1 - Ravine C and F)
Infrastructure
Results
Moline, IL

38th Street, 32nd to 35th Avenue - City of Moline
Infrastructure
Conception
$655,000 CJ est. value
Moline, IL 61265

Mowing Contract For City Parcels
Alteration
Post-Bid
Rock Island, IL

2022 Patching Program
Infrastructure
Results
Moline, IL

19th Avenue, 7th to Rock Island - City of Moline
Infrastructure
Conception
$1,510,730 CJ est. value
Moline, IL 61265

Last Updated 06/05/2023 01:18 PM
Project Title

Various-Hot In-Place Recycling & Micro Surfacing, Single Pass, Mixture C

Physical Address View project details and contacts
City, State (County) Milan, IL 61264   (Rock Island County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $366,868 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County Milan Hot in-place Recycling (35,601 S.y.), Incl. 1,828 Gal. Asphalt Modifier, 41,698 S.y. Micro-surfacing, Single Pass and 6,256 Ft. Paint Pav't. Mark. Line, 4". Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Hot in-place Recycling -23-00000-00-GM Preventative maintenance by the Hot In-Place Recycling, Asphalt Modifier, Micro-Surfacing methods, and Paint Pavement Marking - Line 4" (Yellow & White)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents