Similar Projects
Lindsay Lane and Kelli Drive
New Construction
Conception
Athens, AL 35613

The Foundry f/k/a Governors and 13th
New Construction - 26,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Huntsville, AL 35801

Improvements to Docena Community Center
New Construction
Bidding
Docena, AL 35060

Westgate Gardens Community Room Renovations
Renovation
Bidding
Decatur, AL 35601

Brighton Community Center
New Construction - 3,676 SF
Post-Bid
Brighton, AL

Vestavia Hills Community Center
Post-Bid
$15,000,000 to $16,500,000 est. value
Hoover, AL 35216

Council of Clubs Renovation Project - Contract A
Renovation
Results
Hueytown, AL 35023

Addition to the Frank Brown Recreation Center
Addition
Results
Less than $640,300 est. value
Auburn, AL 36830

New Recreation Center
- 72,000 SF
Construction
Athens, AL

Alexandria
New Construction - 3,066,408 SF
Construction
$32,800,000 est. value
Madison, AL 35758

Laun Recreational Center Flooring Abatement and Replacement and Center Improvements
Renovation
Post-Bid
Mobile, AL 36633

New Senior Center
New Construction
Results
Less than $358,000 est. value
Autaugaville, AL 36003

Wildwood Apartments
New Construction - 196,421 SF
Construction
$46,500,000 est. value
Homewood, AL 35209

Millbrook Senior Center
New Construction - 4,500 SF
Post-Bid
$450,000 to $750,000 est. value
Millbrook, AL 36054

Renovations to the McDonald Hughes Activity Center
Renovation
Results
Less than $466,500 est. value
Tuscaloosa, AL

Last Updated 06/25/2020 08:18 AM
Project Title

Renovations to the Centre Community Center

Physical Address View project details and contacts
City, State (County) Centre, AL 35960   (Cherokee County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,345,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, renovation of the existing Armory Building into a new Community Center located on the City`s Property at 100 Park Street, Centre, AL. The Work consists generally of new site utilities relative to tying in the new building to existing sanitary and water services, limited site improvements relative to utility improvements, interior demolition of various building elements, existing HVAC, existing Electrical and miscellaneous plumbing services. New interior work will consist of, but is not limited to, new masonry and metal stud drywall partitions, new drywall and furring over existing masonry surfaces, new soft tile and hard tile floor finishes, new lay-in and gyp. board ceilings, new Stage construction with hardwood floor and stage curtains, new hollow metal doors and frames, new hollow metal and pre-finished wood doors, new hardware, new HVAC, new Electrical, new toilets, toilet compartments and toilet accessories, new operable partitions, new casework and new commercial kitchen facilities. Facility size is approximately 13,280 s.f.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents