Similar Projects
Group 6-21-C12 Milling and Resurfacing
Infrastructure
Bidding
$10,000,000 to $12,499,999 est. value
PA

Superpave Street Resurfacing
Infrastructure
Bidding
Berwyn, PA

Bituminous Leveling and Overlay
Post-Bid
Landenberg, PA

2021 Road Projects
Infrastructure
Post-Bid
Landenberg, PA

Great Valley Middle School Site Paving & Wall Restoration Phase 2
Results
$950,000 est. value
Malvern, PA 19355

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

In-Place Paving
Infrastructure
Bidding
Downingtown, PA

Roadway and Bridge Reconstruction
Infrastructure
Post-Bid

Chip Seal of Township Roads
Results
Chester Springs, PA 19425

Road Improvement
Infrastructure
Bidding
Pottstown, PA

Resurfacing Roadway
Infrastructure
Post-Bid
Kennett Square, PA

General Construction - Full Service Hook-up, Campsites Loop A
Results
$500,000 to $1,000,000 est. value
Elverson, PA 19520

2022 Road Repairs (Mill and Overlay) Project
Infrastructure
Bidding
Elverson, PA

Woodhaven Road
Infrastructure
Post-Bid
Kemblesville, PA

Sealcoating and Pavement Repairs
Results
West Chester, PA 19382

Last Updated 03/30/2022 06:28 AM
Project Title

Resurfacing and Street Improvements for the Year 2022

Physical Address View project details and contacts
City, State (County) PA   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $225,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstructing West Ewing Road from Lewis Road to Township Line, Mill Surface 1 1/2" Depth approximately 11,500 S.Y. Base Repair Mill approximately 1,100 S.Y. x 4' Wide x 6" Depth Place approximately 1,100 S.Y., 6" Min Compacted Depth 25 MM WMA, 0-0.3 ESALS, PG 64S-22 (Max 15% RAP) Placed in two (2) 3” Lifts Leveling Place Approximately 11,500 S.Y., 1” Min Compacted Depth 9.5 MM WMA, 0-0.3 ESALS, PG64S-22 (Max 15% RAP) Wearing Place Approximately 11,500 S.Y., 1 1/2" Min Compacted Depth 9.5 MM WMA, 0-0.3 ESALS, PG64S-22 (Max 15% RAP) Line Striping 5,250 L.F. 4" Double Yellow Centerline Stop Bar one (1) Thermo Plastic Stop Bar 24” x 10’

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents