Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 est. value
Orange, CA 92869

Newport Beach Junior Lifeguard Parking Lot Project - Phase I
Infrastructure
Bidding
$4,800,000 est. value
Newport Beach, CA 92663

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Term Contract
Bidding
$6,200,000 est. value
Yorba Linda, CA

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

FY 2020/2021 Annual Roadway Resurfacing Project
Alteration
Post-Bid
Dana Point, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Results
$16,200,000 est. value
CA

San Clemente Campground Asphalt Repairs
Infrastructure
Results
$20,000 est. value
San Clemente, CA 92672

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Modify Existing Traffic Signals for Improved Visibility, Add Safety Lighting, Refresh Pavement Delineation
Infrastructure
Design
$2,140,000 est. value
Santa Ana, CA 92799

Reconstruct Curb Ramps and Cold Plane Pavement With RHMA
Infrastructure
Bidding
$11,500,000 est. value
Laguna Beach, CA 92652

Prospect and Spring Right Turn Lane Modification
Term Contract
Post-Bid
Orange, CA 92869

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Reported 06/21/2022 12:52 PM
Project Title

SR-55 Widening from I-405 and I-5 - Orange County Transportation Authority (OCTA)

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA 92627   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected December 2026
Bids Due View project details and contacts
Estimated Value $475,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of additional general purpose and HOV lanes in each direction and add additional auxiliary lanes to the 4-mile stretch from I-405 to I-5 near Tustin. A firm scope has not been determined and several alternatives are currently under consideration. As of June 15, 2022, construction on this project is anticipated to begin in July 2022 and be completed in 2026. Information regarding a design team or a general contractor is not available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents