Similar Projects
Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Singletree Water Storage Tank Interior Painting Project
Post-Bid
Brookline, MA 02445

Material Storage Bin Roofs
Results
Less than $110,000 est. value
Brookline, MA 02445

Pool HVAC Project
Results
$300,000 est. value
Westwood, MA 02090

Remove Existing Roof Down to Concrete Deck
Post-Bid
Less than $25,000 est. value
Walpole, MA

Substation 495 Substation and Transmission Electrical Construction
Results
Less than $400,000 est. value
Norwood, MA 02062

Annual HV-Filter Preventative Maintenance Service
Term Contract
Post-Bid
Brookline, MA 02445

Franklin Senior Center Update
Results
$170,000 est. value
Franklin, MA 02038

HVAC Improvements at Braintree Town Hall
Post-Bid
Less than $120,000 est. value
Braintree, MA 02184

Scheduled and Emergency Structural Repairs and Painting on 6 Bridges at Various Locations
Results
Less than $3,335,820 est. value

Wood Preservation
Post-Bid
Quincy, MA

Roof Replacement at West Acres 705-2
Results
$95,740 est. value
Quincy, MA 02188

HVAC Maintenance and Repair
Post-Bid
Less than $90,000 est. value
Wrentham, MA 02093

Bathroom Mechanical Exhaust Fan Installation - Filed Sub-Bids
Results
Less than $215,676 est. value
Brookline, MA 02446

Milliken Field House Redevelopment - Filed Sub Bids
Post-Bid
$275,000 est. value
Cohasset, MA 02025

Reported 04/10/2021 12:00 AM
Project Title

Fens Gatehouse Repurposing - Sub-Bids

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Masonry, Painting, Plumbing, Roofing
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $1,155,996
Plans Available from State Agency - 03/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. This project is for the renovation of an existing stormwater and sewer control gatehouse to remove unused equipment and accommodate a workshop and office space for DCR's Flood Control Unit staff.

Details

Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents