Similar Projects
Burma Drive Extension
Bidding
Apex, NC

Milling, Resurfacing and Shoulder Grading
Bidding
NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

2019 Pavement Preservation
Results
$100,000 to $250,000 est. value
NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Yonkers Road Improvements
Results
Less than $10,000,000 est. value
Raleigh, NC

Park Depot Greenway
Post-Bid
Fuquay-Varina, NC

Reedy Creek Road Widening
Results
$5,000,000 to $9,106,431 est. value
Cary, NC

Tryon Road Part C Widening Project
Post-Bid
Raleigh, NC

Grading, Drainage, Paving, ITS, and Structures
Results
NC

Action Park Retaining Wall
Post-Bid
Fuquay-Varina, NC 27526

Last Updated 11/03/2020 01:33 PM
Project Title

2019 Street Improvement Project

Physical Address View project details and contacts
City, State (County) Holly Springs, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $708,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Town of Holly Springs 2019 Street Improvement Project includes pavement repair and resurfacing including associated millings, utility adjustments, and pavement marking for Windward Pointe (St. Vincent Drive, Sandy Point Way, Saint Croix Drive), Holly Glen (Holly Meadow Drive, Acorn Falls Court, Holly Meadow Drive, from Rivendell Drive to past Sycamore Creek Drive, Summitt Wood Court), Wescott (Wescott Ridge Drive, Brightling Way), Sunset Ridge (Elmcrest Drive), Turner Street, Braxton Village (Theophilous Trace, Hornholly Way, Entrance at Avent Ferry Road), Valleyfield (Crossfire Road).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents