Similar Projects
Shellmound Street Development
New Construction - 413,638 SF
Conception
$10,000,000 CJ est. value
Emeryville, CA 94608

2929 Broadway Mixed-Use Development
New Construction, Demolition - 222,820 SF
Conception
$10,000,000 CJ est. value
Oakland, CA

2400 Adeline Condominium Development
New Construction - 45,750 SF
Design
$4,600,000 est. value
Oakland, CA 94607

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Cold Plane Pavement and Overlay With RHMA-G/RHMA-O
Infrastructure
Bidding
$67,000,000 CJ est. value
Fremont, CA 94538

Cherry Street Class IV Separated Bikeways
Infrastructure
Bidding
$1,500,000 CJ est. value
Newark, CA 94560

Dublin Transit Center Parking Garage
New Construction - 178,835 SF
Post-Bid
$34,000,000 est. value
Dublin, CA 94568

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Hayward Maintenance Complex (Phase 2) Civil Grading
Infrastructure
Results
$20,000,000 to $40,000,000 est. value
Hayward, CA

The Launch Apartments
New Construction
Construction
$166,000,000 est. value
Alameda, CA 94501

2359 Harrison Street - Mixed-Use Development
New Construction, Demolition - 415,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Oakland, CA 94612

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 348,850 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

Alameda County Fire Department Training Center - #20142 - Alameda County
New Construction, Infrastructure
Conception
$30,056,880 CJ est. value
Dublin, CA 94568

Last Updated 03/08/2023 11:19 AM
Project Title

RFQ Engineering - Bancroft Parking Structure Replacement

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94704   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 8, 2023, information regarding an award is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. ................... The Berkeley campus of the University of California requests that interested Architectural firms submit written statements of qualifications to provide architectural and parking design services, as well as a range of design consultants including but not limited to Traffic Analysis, Estimating, Mechanical, Electrical, Plumbing and Structural Engineering for the new Bancroft Parking Structure's design criteria documents. The Design Team will create bridging documents that define a robust design intent for the new parking structure along with performance and design specifications. The basis of design effort will including Feasibility and Schematic Design phases, followed by a series of campus review meetings, and will conclude with documentation at 50% Design Development. The Design Team will study feasibility and planning alternatives for the specific site and develop multiple schematic design options for consideration by the University. We will look to your team to imbed best practices as foundational ideas in at least six (6) initial schematic design options. The schematic design options will then evolve through an iterative process as preferences are explored, questions and solutions arise, and economic impacts are considered collaboratively with the client. We are seeking a design team that can create and present multiple iterations in quick succession, explain the implications of the revisions, and repeat the cycle until solutions are agreed upon. Questions about this RFQ or the project should be submitted using electronically no later than 5:00p.m. PST on May 17, 2022. Estimated Construction Cost: $ 11.4 million- $20 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of Contractor Selection has not been Determined at this time.

Details

Architectural, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents