Last Updated | 03/23/2023 11:43 PM |
Project Title | SW Division Street Culvert Replacement Project (Rebid) |
Physical Address | View project details and contacts |
City, State (County) | Aloha, OR 97007 (Washington County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,349,930 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of August 11, 2022, bids were rejected, no information for rebid.** The Project cost range is $500,000 - $800,000. Question Deadline 03/20/2023 at 1:00 PM PT Submit questions only in writing on the County's ProcureNow Portal with the Question/Answer feature on the project page. Contact Information Kira Furby Engineering Associate 1400 SW Walnut St. MS 18 Hillsboro, OR 97123 Email: kira_furby@co.washington.or.us Phone: (503) 969-7990 The Work to be done under this Contract consists of the following in Washington County: o Install, maintain, and remove temporary traffic control and erosion control measures o Protect fish, wildlife, and vegetation o Perform all removal of structures and obstructions o Remove and replace existing culverts on SW Division Street o Relocate 8" TVWD waterline o Relocate 8" sanitary service o Protect 36" City of Beaverton waterline o Construct roadway improvements including aggregate base and asphalt o Perform additional and incidental Work as called for by the Specifications and Plans A road closure will be allowed for this project. The Contractor shall complete all in-water Work to be done under the Contract not later than September 30, 2022. All Work to be done under the Contract, including seed establishment, is to be completed not later than October 31, 2022. The Project cost range is $400,000 - $750,000 A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. Bidders are solely responsible for ensuring actual receipt of the bid by Washington County DLUT. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board pursuant to ORS 701.026 prior to submitting a bid. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the county in these bid documents. Otherwise, the bid may be rejected as non-responsive. Bidders must conform to the requirements of these bid documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the Procurement website prior to bidding. Bidders must sign all Bid Forms, and in doing so agree to comply with the statement in the Bid Form regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit the First-tier Subcontractors Disclosure Form provided, either with the bid, or using a separate, linked solicitation on the Procurement site. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). First Tier Subcontractors Disclosure forms submitted via email will not be accepted. Licensing per ORS 468A.720 (working with asbestos) is not required for this project. THE COUNTY: The County reserves the right to waive any irregularities or informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |