Similar Projects
Kilmayne Place Senior Living
New Construction, Infrastructure - 86,000 SF
Conception
$32,000,000 CJ est. value
Cary, NC 27511

Fire Training Center Repaving - Wake County
Infrastructure
Conception
$342,000 est. value
Raleigh, NC 27601

Sportsmanship Crossing Development / Holly Springs
New Construction, Infrastructure - 100,000 SF
Design
$50,000,000 CJ est. value
Holly Springs, NC 27540

New Middle School (M-19) and High School (HS-11) - Wake County Public Schools
New Construction, Infrastructure - 300,009 SF
Design
$128,149,254 CJ est. value
Morrisville, NC 27560

Bowling Road Elementary School - Wake County Public Schools
New Construction, Infrastructure - 134,000 SF
Sub-Bidding
$54,544,624 CJ est. value
Fuquay Varina, NC 27526

Neuse River Resource Recovery Facility (NRRRF) Bioenergy Recovery Project (BERP) - BP 12 - Sidestream Treatment
New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Raleigh, NC 27610

Airport Boulevard Sidewalk Project
Infrastructure
Post-Bid
$500,000 est. value
Morrisville, NC 27560

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

NCSHP Grading and Parking Repairs
Infrastructure
Results
Raleigh, NC 27610

Martin Pond Road Water Main Extension
Infrastructure
Construction
$3,571,596 CJ est. value
Wendell, NC 27591

Raleigh-Durham International Airport (RDU) Runway 5L-23R Pavement Preservation
Infrastructure
Construction
$5,000,000 CJ est. value
Morrisville, NC 27560

Wilder's Grove Retail
New Construction, Infrastructure - 11,000 SF
Pending Verification
$3,500,000 CJ est. value
Raleigh, NC 27610

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

Board of Elections Paving - Wake County
Infrastructure
Conception
$370,000 est. value
Raleigh, NC 27610

Rex Road Elementary School (E-52) - Wake County Public School System (WCPSS)
New Construction, Infrastructure - 133,364 SF
Design
$52,262,682 CJ est. value
Holly Springs, NC 27540

Last Updated 07/19/2023 02:43 PM
Project Title

RFQ Contractors - RDU Park Economy 3 Expansion - Early Package

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27617   (Wake County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $120,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Balfour Beatty / Metcon is seeking to PRE-QUALIFY General Trades, Fencing, and Sitework contractors to submit bids for the furnishing of labor, material, and equipment for the following project: Park Economy 3 Expansion. - Early clearing and grading package for the Park Economy 3 Expansion at RDU Airport. Balfour Beatty / Metcon has been selected as the Construction Manager at Risk (CMR) for the project and will receive bids from and contract with the principal contractors for the execution of the work. *Similar project experience will be considered during prequalification *This is not a request for bid, however, only subcontractors who have completed a prequalification package, and been deemed prequalified for this project, will be considered for a bid on this project Bid Package and Esimate Values: 1. General Trades - $275,000 2. Fencing - $500,000 3. Sitework and Clearing - $6,500,000 The CMR and Authority reserve the right to reject any and all Pre-qualifications. Contracting method will be through Competitive Public Bid in accordance with Chapter 143 of the NC General Statues Minority Owned Small Business (MSB) participation and Women Owned Small Business (WSB) participation goals will be set for each individual bid package. Question Deadline 06/02/2023 at 5:00 PM ET

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents