Similar Projects
Woburn Fire Headquarters - General Bids
New Construction - 33,800 SF
Bidding
$17,000,000 est. value
Woburn, MA 01801

Woburn Fire Headquarters - Filed Sub Bids
New Construction - 33,800 SF
Sub-Bidding
$17,000,000 est. value
Woburn, MA 01801

Owner Project Manager Services for the New Everett Police Station.
New Construction
Post-Bid
Everett, MA

New Tewksbury Fire Station - Filed Sub Bids
New Construction
Post-Bid
Less than $13,400,000 est. value
Tewksbury, MA 01876

Maynard Fire Station - General Bids
New Construction - 19,000 SF
Results
$11,000,000 est. value
Maynard, MA

Maynard Fire Station - Filed Sub Bids
New Construction - 19,000 SF
Results
$11,000,000 est. value
Maynard, MA

Pinehurst Fire Station - General Bids
New Construction
Construction
$6,799,303 est. value
Billerica, MA 01821

North Acton Fire Station 4 - General Bids
New Construction - 11,800 SF
Construction
$7,597,950 est. value
Acton, MA 01720

Devens Public Safety Building
New Construction
Post-Bid
Devens, MA 01434

Dracut Fire Station No. 3 - General Bids
New Construction
Results
$4,500,000 est. value
Dracut, MA

North Fire Station Demolition/Renovation/Addition
Renovation, Addition
Post-Bid
Less than $3,124,000 est. value
Chelmsford, MA 01863

Scheduled and Emergency Facility Repairs and Improvements at Various Locations
Results
Less than $599,720 est. value

Wakefield Public Safety Building Additions Renovations and Upgrades
Renovation
Post-Bid
Less than $6,650,000 est. value
Wakefield, MA 01880

Pinehurst Fire Station - Filed Sub Bids
New Construction
Results
$6,799,303 est. value
Billerica, MA 01821

Dispatch Renovation Reading Police Department - General Bids
Renovation
Post-Bid
$350,000 est. value
Reading, MA 01867

Last Updated 07/20/2020 09:07 AM
Project Title

North Acton Fire Station 4 - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Acton, MA 01720   (Middlesex County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. Construction of a 1-Story fire sub-station with a steel and wood structure and split faced masonry, face brick and cementitious panel siding. Interior spaces consist of a decontamination room, S.C.B.A. Room, firefighter dormitory rooms, a day-room & kitchen, apparatus bays with training props and mezzanine, totaling approximately 11,800 square feet. The work will also include demolition and removal of two existing buildings including but not limited building materials, foundations, utilities, and surface improvements. Additionally site upgrades including but not limited to the installation of a new septic system and tight tank for the apparatus bay floor drains.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents