Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

S9 and S9a Trash Rake and Pump Station Refurbishments
Renovation
Bidding
Fort Lauderdale, Southwest Ranches, FL 33317

Lift Station No. 42 Replacement
Renovation
Bidding
Saint Petersburg, FL 33716

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Lift Station 14A Force Main Replacement
Renovation, Infrastructure
Bidding
Coral Springs, FL

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Irrigation Pump Station Replacement at Pine Trails Park
Results
Parkland, FL 33067

Effluent Disposal Project
Construction
Chipley, FL

Construction Services for the Southwest - 5404 118th Street and 6217 Wilson Boulevard - Class III/IV Pump Station Upgrades
New Construction
Bidding
Jacksonville, FL 32244

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Last Updated 10/07/2021 08:07 AM
Project Title

Wastewater Pumping Station Rehabilitations Design-Build

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected January 2022
Bids Due View project details and contacts
Estimated Value $19,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Services to complete the rehabilitation of 24 City maintained pumping stations located throughout the wastewater collection system. The station rehabilitations may include, but are not limited to the following: replacement of all pumps, motors, pump discharge valves, piping, electrical and control components, concrete restoration and application of protective coatings, installation of safety equipment, driveways, fencing, landscaping, and other equipment needed to restore station reliability and provide improved operation. The majority of the stations are located in residential areas and some stations are very close to adjacent homes. Specialized design and construction approaches shall be developed to minimize and mitigate disruption to the area during the rehabilitation and so that wastewater flow is maintained throughout all phases of the construction. The pumping stations included in the project and additional information on the design build project is provided in the design criteria package.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents