Similar Projects
585 Third Avenue Office Building
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Cambridge, MA 02139

Life Science Campus
New Construction - 450,000 SF
Conception
$10,000,000 CJ est. value
Watertown, MA 02472

Life Sciences Center
New Construction - 139,570 SF
Design
$60,000,000 est. value
Waltham, MA 02453

Cambridgeside 2.0
New Construction, Renovation - 575,000 SF
Design
$10,000,000 CJ est. value
Cambridge, MA 02141

Project Labor Agreement - S2Print
New Construction, Demolition - 80,600 SF
Post-Bid
Natick, MA

MIT Kendall Square Initiative - SoMa
New Construction, Demolition - 1,416,600 SF
Construction
$10,000,000 CJ est. value
Cambridge, MA 02138

Life Science Complex
New Construction, Renovation - 107,350 SF
Construction
$9,572,000 est. value
Framingham, MA 01701

Xmbly
New Construction - 1,600,000 SF
Pending Verification
$10,000,000 CJ est. value
Somerville, MA 02143

Assured Testing Laboratories
Renovation
Pending Verification
Lowell, MA 01851

Boynton Gateway
New Construction - 333,700 SF
Conception
$10,000,000 CJ est. value
Somerville, MA

Cambridge Crossing (CX) - Master Plan
New Construction - 2,500,000 SF
Design
$10,000,000 CJ est. value
Cambridge, MA 02141

Cambridge Crossing - Laboratory
New Construction - 480,000 SF
Construction
$10,000,000 CJ est. value
Cambridge, MA 02141

Ragon Institute 2.0
New Construction - 185,810 SF
Pending Verification
$10,000,000 CJ est. value
Cambridge, MA 02139

G7 Labs
Renovation
Design
Littleton, MA

Sanofi - Laboratory
New Construction - 500,000 SF
Construction
$10,000,000 CJ est. value
Cambridge, MA 02141

Last Updated 10/23/2020 11:40 AM
Project Title

Construction of the Human Engineering Lab - Soldier Squad Performance Research Institute (S2print), Natick Soldier Systems Center, Natick, MA

Physical Address View project details and contacts
City, State (County) Natick, MA   (Middlesex County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Human Engineering Lab - Soldier Squad Performance Research Institute (S2print), Natick Soldier Systems Center, Natick, MA: Project involves the construction of a new 80,600 SF laboratory building to include Administrative Space, Laboratory Space, Network Operations Center and Soldier Performance Lab Areas. The project will also include an optional back-up power supply generator. The project includes related infrastructure such as mechanical rooms, site improvements and utility connections. Construction will also require the demolition of 2-existing buildings and supporting facilities within an area in close proximity to other active buildings at the Natick Soldier Systems Center (NSSC).

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents