Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Pechanga Arena Redevelopment
New Construction, Renovation
Conception
San Diego, CA

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

El Segundo Middle School Gymnasium Project
New Construction
Bidding
$14,000,000 est. value
El Segundo, CA 90245

Y--Correct Critical Safety Hazards and Rehabilitate the Ahwahnee Hotel NHL-Seismic
Renovation
Bidding
$10,000,000 est. value
Yosemite National Park, CA

San Diego International Airport Terminal 1
New Construction
Sub-Bidding
$2,265,000,000 est. value
San Diego, CA 92101

Chuck E Cheese #355
Renovation - 10,920 SF
Sub-Bidding
Stevenson Ranch, CA 91381

Mira Mesa Shopping Center
New Construction - 18,852 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92126

Target #T0322 - Cafe Remodel
Renovation - 2,685 SF
Post-Bid
Mountain View, CA 94040

The 1860 Los Feliz Mixed Use Development
New Construction, Build-Out
Construction
Los Angeles, CA 90000

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

East Village Quarter Tailgate Park Mixed Use Development
New Construction
Pending Verification
San Diego, CA 92101

Atari Hotel
New Construction
Pending Verification
San Jose, CA

Hilton Los Angeles Universal City
New Construction
Conception
Universal City, CA 91608

Last Updated 11/05/2021 01:28 PM
Project Title

Citizen M Hotel

Physical Address View project details and contacts
City, State (County) Menlo Park, CA 94025   (San Mateo County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Food/Beverage Service, Hotel/Motel
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Modular Hotel Construction

Details

Fitness Center, New Construction, Hotel/Motel, 5 Stories Above Grade, 90,868 SF New Construction, 240 Unit(s), Food/Beverage Service, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents