Similar Projects
Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

CHP Arrowhead Area Office-ADA Alterations to Walway, Parking Stalls, and Drainage Structure
Infrastructure
Bidding
$200,000 est. value
Running Springs, CA 92382

Old Town Sidewalk Connectivity Project - Phase 1
Infrastructure
Bidding
$425,000 to $465,000 est. value
Victorville, CA

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Parking Lot Asphalt Repair, Fabric Overlay, Sealing and Striping at the Winnetka DMV Field Office
Alteration
Results
Los Angeles, San Bernardino, CA 91306

Orange Blossom Trail Phase 3
Renovation, Alteration
Results
Redlands, CA 92373

Starbucks - East Highland Avenue / San Bernardino
New Construction, Alteration - 928 SF
Pending Verification
$300,000 est. value
San Bernardino, CA 92404

Village Drive And Stocker Road Sidewalk Improvements - City Of Big Bear Lake
Infrastructure
Conception
$275,000 est. value
Big Bear Lake, CA 92315

9/11 Memorial Monument Project
Infrastructure
Bidding
$965,000 est. value
Fontana, CA 92335

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

Parking Lot Sealcoat
Alteration
Results
Hesperia, CA 92345

Last Updated 06/27/2022 10:14 AM
Project Title

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake

Physical Address View project details and contacts
City, State (County) Big Bear Lake, CA 92314   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Sitework Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $1,591,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 3 of the Trail extends the existing Rathbun Creek Trail from Elm Street to Moonridge Road. It will be a paved trail with picnic areas, wood rail fence and multi-use facilities located along Rathbun Creek. At full build-out, the Rathbun Creek Trail will extend from the shore of Big Bear Lake to the San Bernardino National Forest. The project is included in the City of Big Bear Lake's FY 2022-2026 Capital Improvement Program (CIP). As of June 24, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents