Similar Projects
The Registry on Grass Lake
New Construction
Conception
Winter Garden, FL 34787

Gem Lake - Phase 1 Master Plan
New Construction
Conception
Maitland, FL 32751

Epoch Aloma Senior Apartments
New Construction
Design
$36,000,000 est. value
Winter Park, FL 32792

Hannibal Square Town Homes
New Construction - 240,048 SF
Design
Apopka, FL

Daryl Carter Apartments
New Construction
Bidding
Orlando, FL

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

City Center West Orange Apartments
New Construction - 323,000 SF
Construction
$18,000,000 est. value
Ocoee, FL 34761

Boggy Creek Road Mixed-Use Development
New Construction
Pending Verification
$10,000,000 CJ est. value
Orlando, FL 32824

Mixed-Use Tower
New Construction
Pending Verification
Orlando, FL 32801

Stoneybrook Senior Independent & Assisted Living
New Construction
Conception
Winter Garden, FL 34787

Twelve Oaks
New Construction
Design
Orlando, FL

Crescent Lucerne - Phase 1
New Construction - 693,000 SF
Construction
$66,000,000 est. value
Orlando, FL 32801

Evermore Orlando Resort - Master Plan
New Construction
Pending Verification
Orlando, FL 32836

Torrey Preserve Apartments Phase 1
New Construction
Conception
Orlando, FL 32832

Crescent Park Luxury Apartment Complex
New Construction - 10,000 SF
Design
$41,000,000 est. value
Orlando, FL 32812

Last Updated 08/10/2021 09:29 AM
Project Title

Building Exterior Painting and Necessary Repairs

Physical Address View project details and contacts
City, State (County) Winter Park, FL 32789   (Orange County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment, and any required permitting to perform all work necessary to complete existing Exterior Painting and Necessary Repairs of bldgs. 8 thru 25 and any additional exterior needs as indicated below: 1. Pressure was entire building to be painted including front and rear patios. 2. Remove all damaged siding, replace with new siding to match. 3. Remove leaves & debris from existing gutters, repair/replace gutters as necessary. 4. Evaluate damages stucco / cracked stucco, patch / repair as necessary. 5. Prep and caulk exterior walls and windows where needed. 6. Evaluate louver vents, repair or replace as needed. 7. Evaluate damaged facia boards, repair / replace as necessary. 8. Remove front / rear screen doors do not replace, repair damaged door frame if necessary. (WPHA will provide dumpster for disposal of construction debris including screen doors) 9. Remove existing doorbell and replace with door knockers (knockers provided by WPHA) 10. Paint entire exterior walls and exterior doors of each identified building (paint provided by WPHA). 11. Evaluate flashing repair / replace to eliminate current and future water intrusion (Only on buildings where roof has not been replaced) at The Meadows Apt Complex, 718 Margaret Square., Winter Park, FL 32789 as further described below.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents