Similar Projects
Last Updated | 03/03/2021 10:47 AM |
Project Title | Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: IA, ID, MN, MT, ND, NE, OR, SD, WA, WI, WY |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Original Set Aside: 8(a) Set-Aside - contract for environmental remediation services will include service and construction activities mandated by the Defense Environmental Restoration Program (DERP): Contractors selected for this work must have the capability and experience to perform or provide a wide range of remedial action services at hazardous waste sites. These efforts may include environmental removal actions, remedial actions, and other remediation activities as well as related activities necessary to ensure complete and successful remediation. Remedial activities may include, but not be limited to, excavation, transportation, and disposal of hazardous, toxic, or low level radiological waste; construction and operation of groundwater treatment plants and extraction systems; dredging of contaminated sediments; installation and operation of in site treatment technologies including but not limited to air sparging, chemical oxidation, bioremediation, ground-water circulating wells, permeable reactive barriers, soil vapor extraction, and thermal treatment; water and wastewater line installations/service connection hookups; utility line replacement and/or remediation along utility lines; and erosion, sewer, and storm water controls for the purpose of compliance and/or pollution prevention. Supporting activities include, but are not limited to, sampling and laboratory analysis of soil, groundwater, surface water, air, and sediments; monitoring well, extraction well, and injection well installation, monitoring, and maintenance; supporting facilities for construction; work plan preparation; construction completion reports, as-built drawings, periodic monitoring reports, operation and monitoring reports, and other documents as needed; demolition; and public relations activities. Environmental Remediation Services (ERS) and will support existing and future USACE customers of the five Northwestern USACE Districts (Seattle, Walla Walla, Portland, Kansas City, and Omaha). The Northwestern District has a geographic footprint covering the following states: Washington, Oregon, Idaho, Montana, North Dakota, South Dakota, Minnesota, Wisconsin, Wyoming, Nebraska, Iowa, Colorado, Kansas, and Missouri. |
||||||||||||||||||||||||||||||||||||||||
Details | Military Facility, New Construction.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |