Similar Projects
Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Bidding
$185,000 est. value
Las Vegas, NV

South Tower and Round Wing Cast Iron Piping Replacement
Infrastructure
Bidding
$2,600,000 est. value
Las Vegas, NV 89102

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

Boiler Preventative Maintenance and Repairs Countywide
Demolition
Results
NV

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

Pinto Campus IT Operations Data Center Chiller Replacement
Alteration
Bidding
$1,076,350 to $1,133,000 est. value
Las Vegas, NV 89106

Fume Hood
Post-Bid
Las Vegas, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Big Bend Water Treatment Plant, Ozone Generator Room HVAC Upgrade Project
Alteration
Bidding
$182,681 est. value
Laughlin, NV 89029

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

Court House Chiller Replacement
Results
$200,000 est. value
Carson City, NV 89701

NV Ang Building 9 Chiller Replacement
Post-Bid
Reno, NV 89502

Last Updated 07/16/2021 09:37 AM
Project Title

Sierra Building Boiler Refurbishment

Physical Address View project details and contacts
City, State (County) Reno, NV 89512   (Washoe County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace the boilers and heat exchanger at the Sierra Building on the Dandini Campus to updated equipment as per drawings and specifications designed by Petty & Associates as the whole of the SPWD Permit 21-B040.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents