Reported 04/23/2021 12:00 AM
Project Title

2021 Infrastructure Maintenance

Physical Address View project details and contacts
City, State (County) Champaign, IL   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Location No. 1-Alley Maintenance: Approximately 400 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate sub base The east alley approach will also be reconstructed. Location No. 2-North Campus Infrastructure Repair: Approximately 465 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate sub base. The alley approaches will also be reconstructed. Location No. 3-North Campus Infrastructure Repair: Approximately 330 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate sub base. The alley approaches will also be reconstructed. Location No. 4-Brick Street Rehabilitation: Brick pavement patching will be performed. Sidewalk ramps will be reconstructed and and deteriorated combination concrete curb and gutter and sidewalk will be removed and replaced. Location No. 5-Sidewalk Rehabilitation: Sidewalk ramps will be reconstructed and deteriorated sidewalk will be removed and replaced. Location No. 6-Sidewalk Gap: Approximately 290 feet of sidewalk will be constructed on Broadmoor Drive. Approximately 255 feet of existing sidewalk will be removed and replaced between Devonshire Drive and McDonald Court. Location No. 7- Mellon Building Sidewalk Replacement: Approximately 506 feet of sidewalk will be replaced on the south side of John Street and the west side of New Street. Location No. 8-Parking Lot Improvements: The parking lot at the southwest corner of 2nd Street and University Avenue will be reconstructed with curbed islands, aggregate base course, and HMA resurfacing. Location No. 9-Public Works HMA Resurfacing: Various areas at the Public Works Maintenance Facility will be resurfaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents