Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Riverside Wharf
New Construction - 400,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

MCID-2
New Construction, Renovation, Build-Out - 1,141,800 SF
Design
$10,000,000 est. value
Miami, FL

New Miami International Airport Hotel
New Construction
Post-Bid
Miami, FL 33126

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

South Dade Logistics and Technology District
New Construction
Conception
Miami, FL

Hyatt Towers
New Construction
Design
$10,000,000 CJ est. value
Miami, FL

Hotel 18
Renovation, Addition - 15,557 SF
Construction
$8,000,000 est. value
Miami Beach, FL

Jungle Island Hotel
New Construction, Build-Out, Demolition - 346,000 SF
Design
Less than $300,000,000 est. value
Miami, FL

AC Hotel By Marriott & Element By Westin
New Construction - 260,335 SF
Construction
$90,000,000 est. value
Miami, FL

111 Wynwood
New Construction - 46,874 SF
Design
$8,000,000 est. value
Miami, FL

Comfort Inn & Suites
New Construction - 69,825 SF
Construction
$15,200,000 est. value
Medley, Miami Springs, FL 33166

Moxy Hotel
New Construction - 98,189 SF
Design
$20,602,737 est. value
Miami, FL

Reported 02/02/2022 03:17 PM
Project Title

72 & Collins

Physical Address View project details and contacts
City, State (County) Miami Beach, FL 33010   (Miami-Dade County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $17,495,787
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include hotel and condominium. Parking is on Levels 1 and 2. Level 3 has amenities. Levels 4-9 are hotel rooms. Levels 10 and 11 will be condominium units. There are swimming pools on Level 3 and Level 8. Mixed Use.

Details

1 Hotel/Motel, 11 Stories Above Grade, 232,338 SF New Construction 187 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents