Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Tower Terrace Road from Miller Road to I-380
Conception
$1,500,000 est. value
Cedar Rapids, IA

FY 2022 Pavement Patching
Bidding
$1,400,000 est. value
Cedar Rapids, IA

2021 Water Pavement Patching Project
Infrastructure
Bidding
$132,000 est. value
Iowa City, IA

Clover Lane Overlay
Post-Bid
Asbury, IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Post-Bid
$1,380,000 est. value
Cedar Rapids, IA 52407

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Emerald Drive Reconstruction
Infrastructure
Results
Davenport, IA 52804

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

Muddy Creek Lane Patching and Subdrain
Infrastructure
Bidding
$143,810 est. value
Coralville, IA

6th Street SE from 4th Avenue to 6th Avenue
Post-Bid
$950,000 est. value
Cedar Rapids, IA 52401

2021 Alley Resurfacing Program
Infrastructure
Results
Davenport, IA

Ingleside Drive South West Pavement Improvements
Conception
$250,000 est. value
Cedar Rapids, IA 52404

Johnson Avenue Reconstruction (Fairmount to Gayman)
Infrastructure
Bidding
Davenport, IA 52802

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Post-Bid
Waterloo, IA

Last Updated 06/01/2021 04:39 AM
Project Title

Marquette and West 12th Street Replacement

Physical Address View project details and contacts
City, State (County) Davenport, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work include, but not limited to, the furnishing of all labor to the removal of the P.C.C. Roadway, full depth aggregate stone base material, geo fabric / grid materials, adjacent driveway approaches / sidewalk (where applicable), underdrains and reconstruct the roadway with a H.M.A. rigid pavement section and underdrain, reset all existing utility surface features to finish grade, complete ADA accessible ramps, driveway approach replacements and seeding / sodding as depicted on the construction plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents