Similar Projects
Chapman Lane Water Main Replacement
Infrastructure
Post-Bid
Cold Spring, KY 41076

Water Main and Appurtenances Work
Term Contract, Alteration
Post-Bid
Covington, KY

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Joyce Avenue Water Main Replacement
Infrastructure
Post-Bid
KY

Dudley Double-Seated Ball Valve with Actuator
Results
Less than $72,732 est. value
Edgewood, KY 41017

Crowell Avenue and Eustace Avenue Water Main Replacement
Results
Fort Thomas, KY

Persimmon Sassafras Sugar Tree Walnut and Willow Water Main Replacement
Results
Less than $472,922 est. value
Erlanger, KY 41018

Greenup Street Water Main Connection
Results
Covington, KY

Greenup Street Water Main Connection
Results
Less than $52,015 est. value
Covington, KY 41018

Covert Run Pike to Lincoln Road Water Main Replacement
Results
Less than $282,969 est. value
Covington, KY 41018

Meter Reading System Replacement
Results
Erlanger, KY 41018

Lakeview Force Main Partial Replacement
Results
Fort Wright, KY

Saint Joseph Lane Water Main Replacement
Results
Erlanger, KY 41018

Installation of New Water Services at Various Locations
Term Contract
Results
Erlanger, KY 41018

Last Updated 11/23/2021 05:46 PM
Project Title

River Water Intrusion - Groups 2 And 3 Improvements

Physical Address View project details and contacts
City, State (County) (Campbell, Kenton Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to complete the construction of river water backflow prevention devices at fourteen (14) separate sites along the Ohio and Licking Rivers.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents