Similar Projects
Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Fire Station 3 Remodel
Renovation
Conception
San Marcos, TX 78666

City of Cuero Texas Renovations and Additions
Renovation, Addition
Design
Cuero, TX 77954

Emergency Services Station with Living Quarters
New Construction - 10,000 SF
Design
Hudson Oaks, TX 76087

Fort Bend County Emergency Services District 7 - Fire Station #52
New Construction - 12,696 SF
Bidding
$500,000 est. value
Fresno, Rosharon, TX 77545

New Police Station
New Construction
Bidding
Rosenberg, TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Fire Station No. 5
Post-Bid
TX

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

Fire Station 6
Construction
League City, TX

Police Headquarters and Fire Station #2 and Administration Buildings
New Construction - 73,273 SF
Construction
Less than $19,700,000 est. value
Huntsville, TX 77340

Emergency Operations Center
Renovation
Pending Verification
Killeen, TX 76541

Station 5 Bay Remodel
Renovation
Pending Verification
Killeen, TX 76542

New Fire Station
New Construction
Conception
$10,000,000 est. value
San Marcos, TX 78667

Last Updated 05/10/2022 03:23 PM
Project Title

New Police Facility

Physical Address View project details and contacts
City, State (County) Seagoville, TX 75159   (Dallas County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Design-Build. Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design Build firm to program, design and construct the new facility on a site at East Simonds and Farmers Road in Seagoville. The new Police Station will provide police department administrative areas, staff areas and a holding facility for the rapidly growing community. The facility will provide a state-of-the-art police department to accommodate growing community services. The facility will be a single-story building that will accommodate administrative areas, training areas, dispatch, criminal investigation areas, a fitness center and holding cells with an attached sally port. The project includes approximately 18,500 SF facility and associated site work. A topographic survey and geotechnical testing of the site will be completed by the City.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents