Similar Projects
Philmnt/Tomlinson/Pine Road Intersection
Infrastructure
Conception
Huntingdon Valley, PA 19006

Main Street/SR 29 Ped Improvements
Alteration
Conception
$682,000 est. value
Collegeville, PA 19473

North Narberth Avenue O/AMTRAK
New Construction, Infrastructure
Design
Narberth, PA 19072

23 Moore to Geerdes
Infrastructure
Design
King of Prussia, PA 19487

Bysher Field Paving of Existing Trail
Infrastructure
Bidding
$300,000 est. value
Flourtown, PA 19031

Main Street Streetscape Phase IV
Infrastructure
Bidding
$500,000 to $550,000 est. value
Norristown, PA 19488

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

2020 Road Projects
Results
Collegeville, PA 19426

2020 Contracted Milling/Paving and Line Painting
Results
Horsham, PA 19044

Ridge Pk Norris-Butler (W)
Infrastructure
Design
$10,393,000 est. value
PA

2022 Landis Road Trail
Infrastructure
Bidding
$500,000 est. value
Skippack, PA

Paving Restoration at Whitemarsh Elementary School, Ridge Park Elementary School and Plymouth Elementary School
Infrastructure
Post-Bid
$560,000 est. value
Lafayette Hill, PA 19444

Roadway and Miscellaneous Repairs
Results

Lancaster Ave and Remington Rd Int. Improvements
Infrastructure
Design
$1,572,219 est. value
Wynnewood, PA 19096

Last Updated 06/23/2022 12:08 PM
Project Title

PA 309 Connector PH3

Physical Address View project details and contacts
City, State (County) Hatfield, PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected February 2027
Bids Due View project details and contacts
Estimated Value $63,936,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Franconia, Hatfield AND Hilltown Twps. Primary Improvement Type: New Roadway As of June 22, 2022, the project is Future development stage. Anticipated letting date is December 11, 2026. PennDOT - PA 309 Connector Ph3 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents