Similar Projects
The Edge at Davie
New Construction, Build-Out, Demolition - 1,210,110 SF
Conception
$10,000,000 CJ est. value
Davie, FL 33314

Icon Residences Hollywood
New Construction
Conception
$112,300,000 est. value
Hollywood, FL 33019

Nautilus Apartments
New Construction - 118,360 SF
Design
$16,800,000 est. value
Hollywood, FL 33021

New River Central
New Construction - 588,346 SF
Design
$80,000,000 est. value
Fort Lauderdale, FL 33301

The Adderley
New Construction, Build-Out - 649,350 SF
Sub-Bidding
$103,700,000 est. value
Fort Lauderdale, FL 33311

Beachside Residences
New Construction - 94,921 SF
Post-Bid
$24,000,000 est. value
Hollywood, FL 33019

Casa Murano
New Construction - 48,107 SF
Post-Bid
$9,000,000 est. value
Fort Lauderdale, FL 33301

Griffin Gardens II - Owner's Representative/Construction Manager
New Construction
Results
FL

Downtown Properties Redevelopment Project Phase One - Development
New Construction, Infrastructure
Results
Oakland Park, FL

Hollywood East
New Construction, Build-Out
Construction
$48,650,000 est. value
Hollywood, FL 33020

2000 Ocean
New Construction
Construction
$92,000,000 est. value
Hallandale, FL 33009

Station Village
New Construction, Build-Out - 432,800 SF
Pending Verification
$10,000,000 CJ est. value
Fort Lauderdale, FL 33311

Ombelle
New Construction, Build-Out - 1,043,963 SF
Pending Verification
$10,000,000 CJ est. value
Fort Lauderdale, FL 33301

Pearl Sunrise
New Construction
Conception
Sunrise, FL 33351

Harbourside at Hidden Harbour
New Construction - 1,072,674 SF
Design
$10,000,000 CJ est. value
Pompano Beach, FL 33062

Last Updated 06/10/2022 01:12 PM
Project Title

Nine Hollywood

Physical Address View project details and contacts
City, State (County) Hollywood, FL 33020   (Broward County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Construction Commenced May 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $24,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To include 7315 sq. ft. of retail spaceMixed Use.

Details

1 Apartments/Condominiums, 13 Stories Above Grade, 106,284 SF New Construction 204 Unit(s), New Construction, 260 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Elevators.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents