Similar Projects
Fenway Park Mixed-Use
New Construction
Conception
Boston, MA

North End Cross Street Boutique Hotel
New Construction - 87,142 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Boston, MA 02114

11 Faneuil Street
New Construction - 43,820 SF
Design
$13,500,000 est. value
Brighton, MA 02135

1234-1240 Soldiers Field
New Construction - 14,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Boston, MA 02135

Miranda-Creamer/South End Fitness Center Repairs
Results
Less than $3,300,000 est. value
Boston, MA 02108

Miranda-Creamer South End Fitness Center Repairs - General Bids
Renovation
Results
$4,730,435 est. value
Boston, MA 02118

Government Center Garage Redevelopment
New Construction, Demolition - 2,310,100 SF
Construction
$2,200,000,000 est. value
Boston, MA

Marine Wharf Hotel
New Construction - 320,000 SF
Construction
$160,000,000 est. value
Boston, MA 02127

Enterprise Research Campus
New Construction - 900,000 SF
Pending Verification
$10,000,000 CJ est. value
Allston, MA

Mattapan Housing and Day Care
New Construction
Pending Verification
Dorchester, MA

54 Yeamans Street Ice Cream Shop
Renovation
Conception
Revere, MA 02151

Washington Street Mixed-Use
New Construction - 28,000 SF
Design
$60,000,000 est. value
Jamaica Plain, MA

Miranda-Creamer South End Fitness Center Repairs - Filed Sub Bids
Renovation
Results
$3,194,390 est. value
Boston, MA 02118

The Ceintures
New Construction - 78,432 SF
Construction
$11,000,000 est. value
South Boston, MA 02127

Dorchester Bay City
New Construction - 6,112,000 SF
Pending Verification
$10,000,000 CJ est. value
Dorchester, MA 02132

Reported 09/24/2021 09:09 AM
Project Title

Alexandra Hotel

Physical Address View project details and contacts
City, State (County) South End, MA 02118   (Suffolk County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Food/Beverage Service, Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, 1 Hotel/Motel, 13 Stories Above Grade, 60,000 SF New Construction 150 Unit(s), Food/Beverage Service, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents