Similar Projects
16th Street Southwest - Minot City
Infrastructure
Conception
$1,700,000 est. value
Minot, ND 58701

RW 8-26 and TW Bravo Design and Construction - A6 - City of Minot
Infrastructure
Conception
$9,600,000 CJ est. value
Minot, ND 58701

Broadway Circle Affordable Housing
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Minot, ND 58701

Phase RC-1: Mouse River Park Bridge - City of Minot
Infrastructure
Design
$1,225,000 CJ est. value
Minot, ND 58701

Spall Repair, Concrete Pavement Repair, Joint Seal, Grinding
Infrastructure
Bidding
$2,500,000 CJ est. value
Minot, ND 58701

Spall Repair, Concrete Pavement Repair, Joint Seal, Grinding
Infrastructure
Bidding
$2,500,000 CJ est. value
Minot, ND 58701

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pavement Rehabilitation (Seal Coat), Crack Sealing and New Pavement Markings
Renovation
Results
$160,000 est. value
Kenmare, ND

2025 Edison Safe Routes to School - 4667 - City of Minot
Infrastructure
Conception
$440,000 CJ est. value
Minot, ND 58701

2022 Exploratory Drilling AML
Term Contract, Infrastructure
Post-Bid

Paving District 499 - Family Rec
Infrastructure
Results
$1,443,746 est. value
Minot, ND

Runway 8 Approach Obstruction Clearing And Easement Acquisition - City of Minot
Infrastructure
Conception
$650,000 CJ est. value
Minot, ND 58703

RFQ D/B - Consolidated Helo/TRF/OPS AMU & Alert Facility
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Minot AFB, ND 58704

Last Updated 11/10/2022 07:38 AM
Project Title

3rd Street East and Central Avenue Reconstruction - E-13 - City of Minot

Physical Address View project details and contacts
City, State (County) Minot, ND 58703   (Ward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $11,760,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 3rd St corridor from 5th Ave SE to 1st Ave NE and the Central Ave Corridor from 3rd St to 5th St NE has pavement conditions in fair to good ranges, but the underground utilities vary in condition. The street lighting is also in fair to poor condition. The signal at Central Ave/3rd St is in need of replacement. These corridors are the next phase of downtown that should be reconstructed. If the utilities were in better shape, a pavement reconditioning program would be recommended. It is unknown if the utilities can last another 15 years. The proposed project would reconstruct both corridors to match the newly reconstructed downtown. As November 10, 2022, this project is currently in the FY 2022-2026 Capital Improvements Plan. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents