Similar Projects
USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

Reported 04/08/2021 12:00 AM
Project Title

Inpatient MRI-2

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30303   (Fulton County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The Inpatient MRI-2 project (The "Project") includes fit-up of an existing imaging room which was partially fit-up with temporary finishes when the "Expansion Building" was constructed approximately five (5) years ago. One MRI machine was purchased and installed at the time of initial construction, while the second MRI room remained vacant. The second MRI machine was recently approved for purchase. The equipment purchased is a Siemens 3T MRI. Radiology is seeking to increase capacity and expand imaging capabilities through addition of the 3T scanner to the imaging fleet. The existing future imaging room 3C112 is finished in a temporary state. The scope of work includes remodeling of room 3C112, and minor remodeling and updates to the associated shared control room 3C110B. The equipment is supported by an existing, adjacent equipment room 3C114 which will be fit up with Siemens equipment. Construction scope includes infrastructure connections and integration in accordance with Siemens final equipment drawings, which will be made part of the bid documents set. The 3T magnet will be delivered by Siemens late summer or early fall 2021. The GC partner will be expected to coordinate closely with the equipment provider and installers.

Details

Hospital, Renovation.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents