Similar Projects
Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Ductile Iron Pipe
Term Contract
Post-Bid
Dallas, TX

SRT Frontage Road Pavement Rehabilitation
Results
$914,435 est. value
TX

Street Group 12-462
Results
$5,300,000 est. value
Dallas, TX 75241

23 Springs Mixed-Use / Dallas
New Construction, Infrastructure - 669,591 SF
Construction
$169,000,000 est. value
Dallas, TX 75201

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

W W Bushman Elementary School - 2020 Bond - Dallas Independent School District
Renovation, Infrastructure
Pending Verification
$30,986,820 CJ est. value
Dallas, TX 75216

Staff Zone / Irving
New Construction, Infrastructure - 3,873 SF
Pending Verification
$800,000 CJ est. value
Irving, TX 75061

City Jail Expansion and Upgrades - City of Carrollton
Addition, Demolition, Renovation, Infrastructure
Design
$2,400,000 CJ est. value
Carrollton, TX 75006

Butterfly Valves Parts and Actuators Repair Services
Term Contract
Post-Bid
Dallas, TX

State Highway 161 Water Improvements
Results
$846,224 est. value
Irving, TX 75038

Parking Lot Repair
Infrastructure
Construction
Dallas, TX 75224

McKinney Avenue Mixed-Use
New Construction, Infrastructure - 697,000 SF
Design
$200,000,000 CJ est. value
Dallas, TX 75201

Last Updated 09/21/2022 12:12 PM
Project Title

Miller Road Paving, Drainage and Utility Improvements

Physical Address View project details and contacts
City, State (County) Rowlett, TX 75088   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Deadline for questions is February 11, 2022 at 2:00pm. All questions shall be submitted to purchasing@rowlett.com. Work no later than 300 calendar day This project consists of approximately 5,750 linear feet of Miller Road from Glen Hill Drive to Dalrock Road and 1,000 linear feet of Chiesa Road at its intersection with Miller Road in Rowlett, Texas, from a two-lane rural roadway to a 4-lane divided thoroughfare. Major items include 39,224 square yards of reinforced concrete pavement, 6,640 tons of hot-mix asphalt pavement, 6,112 total linear feet of reinforced concrete storm drain, 177 total linear feet of sanitary sewer line, 3,777 total linear feet of water main, and various other items. The work under this contract includes furnishing all labor, tools, material, and equipment, and for performing all work necessary for construction of Miller Road within the approximate limits as listed in SC.02 and all related work as shown on the plans. Construction plans were prepared and provided by Huitt-Zollars, In

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents