Similar Projects
By-Pass Pumps Maintenance
Bidding
Davie, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Flygt Pumps Replacement/Repair Services
Post-Bid
Miramar, FL

West Water Treatment Plant High Service Pumps MCC Replacement
Results
Less than $320,000 est. value
Deerfield Beach, FL 33441

Boesch Submersible Turbine Pump Model 10HxH-1C (1 Stage)
Term Contract
Results
$10,475 to $31,425 est. value
Hollywood, FL 33022

Rebuilding of Two (2) Stormwater Water Lubrication Pumps
Results
Hollywood, FL 33025

Mechanical Integrity Testing for Deep Injection Wells
Results
Miramar, FL 33027

Supply and Delivery of Two (2) Split Case Horizontal Pumps
Results
Plantation, FL 33317

Mechanical Integrity Testing (MIT), Sawgrass Water Treatment Plant (WTP) Concentrate Well CW1
Results
Sunrise, FL

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Access Structure and Wetwell Rehabilitation - Term Contract
Term Contract
Results
Plantation, FL

Supply and Delivery of Well Pump
Results
Plantation, FL 33317

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
Less than $175,000 est. value
Fort Lauderdale, FL 33301

Irrigation Pump Control Upgrade to VFD
Results
Weston, FL

Reported 03/07/2020 12:00 AM
Project Title

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives

Physical Address View project details and contacts
City, State (County) Coral Springs, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal, repair and re-installation of two Vertical Single End Suction Axial Flow Pumps and right-angle gear drives.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Liquid Pumps, Centrifugal Liquid Pumps, Gear Liquid Pumps.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents