Similar Projects
Camden Baker Apartments
New Construction - 214,991 SF
Conception
Denver, CO 80223

Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

Towneplace Suites and Fairfield Inn by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

4055 North Elati Street Mixed Use
New Construction - 67,476 SF
Design
Denver, CO 80110

Reunion Ridge Filing 2 and 3 Improvements
Infrastructure
Bidding
$11,000,000 CJ est. value
Commerce City, CO 80022

Brighton Park Irrigation System Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Brighton, CO 80601

Parterre
New Construction
Post-Bid
Thornton, CO 80602

Habitat For Humanity
Post-Bid
Denver, CO 80014

Architectural Engineering Services-Overlook at Thornton Apartments
Addition
Results
Less than $16,000,000 est. value
Denver, Thornton, CO 80260

PKAA Chicago In Spring Mine Closure Project, 709N
Results
Less than $100,000 est. value
Denver, CO

Aspire Aprtments
New Construction - 93,283 SF
Construction
$61,000,000 est. value
Westminster, CO 80031

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Apartment Building
New Construction - 310,000 SF
Pending Verification
Denver, CO 80204

Apartment Building
New Construction - 310,000 SF
Pending Verification
Denver, CO 80204

Evans East
New Construction - 315,000 SF
Conception
$10,000,000 CJ est. value
Denver, CO 80204

Last Updated 08/25/2022 04:32 PM
Project Title

Kabin 2.0 North and South Buildings

Physical Address View project details and contacts
City, State (County) Denver, CO 80216   (Denver County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $38,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for two 4-story modular residential multi-family buildings. 2091 31st Street (South Building) contains 128 units, 2099 31st Street (North Building) contains 79 units. An architect has been selected. As of August 25, 2022 this project submitted for building permits with the City of Denver Building Permits on March 22, 2022 and the project continues to be in review. General contractor information has not been disclosed. Although a firm schedule has not been established, construction is not expected to begin before late third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 119,123 SF - 4 Stories Above Grade, 72,077 SF. 4 Stories Above Grade, 47,046 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents