Similar Projects
Fire Administration Stand-By Power Redundancy for Critical Facility - FA2402 - City of Pearland
Renovation, Alteration
Conception
$620,000 est. value
Pearland, TX 77584

Install Illumination - SS 172
Infrastructure
Sub-Bidding
$648,035 CJ est. value
Belton, TX 76513

Belton Water Plant Standby Power Generation
Alteration
Post-Bid
Belton, TX 76513

Annual Contract for Lamps
Term Contract
Post-Bid
San Antonio, TX

Provide and Install an Emergency Generator
Alteration
Results
$175,000 est. value
San Antonio, TX

Indefinite Quantity Contract for Electrical Work
Term Contract
Results
San Antonio, TX

Quarterly Preventative Maintenance of Generators
Term Contract
Post-Bid
Pearland, TX

Lighting Upgrades and Mechanical Upgrades
Alteration
Results
$301,200 est. value
Helotes, San Antonio, TX 78238

Energy Management Services
Alteration
Post-Bid
San Antonio, TX

West End Water Supply Corporation Emergency Backup Generator at Willow Springs Water Plant
Alteration
Results
$258,000 est. value
TX

Replace High Mast Poles FCI Seagoville
Term Contract
Post-Bid
Seagoville, TX 75159

Acquisition of Portable Generator
Alteration
Results
Elgin, TX

Statewide Generator Inspection, Preventative Maintenance and Repair Services
Term Contract, Alteration
Post-Bid

Electrical Services at Lufkin State Supported Living Center
Term Contract, Alteration
Results
$60,000 est. value
Pollok, TX 75969

Generator Inspection, Preventative Maintenance and Repair Services
Term Contract
Post-Bid

Last Updated 06/09/2023 01:37 PM
Project Title

ARPA Emergency Generator

Physical Address View project details and contacts
City, State (County) Como, TX 75431   (Hopkins County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $127,760 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The work to be done hereunder includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, appurtenances and incidentals necessary for the complete, operational, and satisfactory construction as follows: (1) Plant 2: Furnish and install new 150 KW generator, concrete foundation, automatic transfer switch, and appurtenances as described within the specifications and as shown on the drawings GENERAL: The generator to be constructed under this Contract shall comply with the conditions set forth herein and with the latest electrical code. No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders. If an addendum to the bid package is necessary, it must be distributed to each potential bidder. The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file. The addendum shall allow adequate time for consideration in bid preparation (usually at least one week). If adequate time is not available, the bid opening date must be extended and the Grant Recipient must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents