Similar Projects
New Dezavala Elementary
New Construction
Bidding
Channelview, TX 77530

Kipp South Campus Phase I Classroom Building
Post-Bid
Houston, TX 77085

Bunker Hill Elementary School Replacement
Post-Bid
Houston, TX 77024

Holbrook and Post Elementary School and Kahla Middle School Renovations
Renovation
Results
Less than $5,100,000 est. value
Houston, TX 77084

M. Robinson, A. Robison, Swenke, Tipps, and Warner Elementary School Renovations
Renovation
Results
Less than $1,211,262 est. value
Cypress, TX 77433

Elementary No. 29 - Alternates Proposal
New Construction - 116,450 SF
Construction
Less than $25,823,400 est. value
Humble, TX

Renovations to Treasure Forest and Buffalo Creek Elementary Schools
Renovation
Construction
$16,000,000 est. value
Houston, TX 77055

Black, Danish, Duryea, Farney, Kirk, Lee, and Sampson Elementary School Renovations
Renovation
Post-Bid
Less than $2,352,853 est. value
Cypress, TX 77429

Package D - New Cobb/Schochler Elementary School
New Construction - 180,000 SF
Results
Less than $35,650,911 est. value
Channelview, TX 77530

Construction of the New Red Bluff Elementary School
New Construction
Construction
Less than $22,147,633 est. value
Pasadena, TX

M.E.P. Interior Renovation Of Kipp SSP Modular Buildings (Phase 2)
Post-Bid
Houston, TX 77000

2019 Andre, Birkes, Emery, Frazier, Hemmenway, Lamkin, Postma & Yeager ES Renovations
Renovation
Results
Houston, TX 77095

Saint Vincent de Paul Catholic School Academic Building
New Construction, Addition - 24,076 SF
Construction
$9,500,000 est. value
Houston, TX 77025

Northampton Elementary School Renovations
Renovation - 20,000 SF
Post-Bid
$1,411,884 est. value
Spring, TX 77389

Portable Building Walkway Canopy Installations
Results
Less than $75,000 est. value
Houston, TX

Last Updated 08/02/2021 09:25 AM
Project Title

Hunters Creek Elementary School Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX 77024   (Harris County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Nearing Completion, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $22,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, 108,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents