Similar Projects
Construction of Milton Fire Station 42
New Construction, Infrastructure
Bidding
Milton, GA 30004

Design Build Renovations/Construction at Warner Robins Fire Station 3
Renovation - 2,550 SF
Bidding
$700,000 est. value
Warner Robins, GA 31088

West Jackson Fire Station No 2
New Construction
Post-Bid
Less than $1,300,000 est. value
Braselton, GA

Savannah Regional Police Academy Expansion
Addition - 7,442 SF
Post-Bid
Savannah, GA

Bathroom Renovation at Fire Station 23
Renovation
Results
Powder Springs, GA 30127

Renovation of New Public Safety Facility
Renovation, Addition - 7,500 SF
Results
Dahlonega, GA 30533

Construction Manager at Risk Services for Fire Station #3
Construction
Cartersville, GA

Construction of New Fire Station 2
New Construction
Construction
$2,997,577 est. value
Augusta, GA

Cumberland Mall Redevelopment
New Construction - 476,200 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, Smyrna, GA 30339

Purchase, delivery to site, installation and Erection of Fire Station Building
New Construction - 3,300 SF
Bidding
GA

Key Hose for the Forsyth County Fire Department
Post-Bid
Cumming, GA 30040

Clay County Fire Station 1 and Emergency Services
Renovation
Results
GA

Construction of New Fire Station 20
New Construction
Construction
Hephzibah, GA 30815

Parking and Exterior Enhancements LaGrange Police Department
Renovation
Bidding
LaGrange, GA 30240

Reconstruction of Pembroke Police Department Office
Renovation
Post-Bid
Pembroke, GA 31321

Last Updated 08/12/2021 03:26 PM
Project Title

Additions To Cherokee County Fire Training Center

Physical Address View project details and contacts
City, State (County) Holly Springs, GA 30115   (Cherokee County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,313,458
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of additions to the Cherokee County Fire & Emergency Services Training Center located at 3985 Holly Springs Parkway, Holly Springs GA 30115. The additions include an approximately 3,190 square foot single story expansion of the Training Center which includes new offices and classroom areas and associated storage. The large classroom area includes an operable partition system to allow it to be divided into two smaller classrooms. The new addition will be preengineered metal building construction with gypsum board and metal framed interior walls. The building exterior will be a mixture of pre-engineered metal building panels and brick veneer to continue the look of the existing facade. The site work will include demolition of some existing parking area, construction of new parking and connection to other facilities on the campus via a new set of concrete exterior stairs. The generator that powers multiple buildings on this campus is also being replaced in this project’s scope. Scope also includes replacement of security system for entire facility.

Details

1 Fire/Police Station, 1 Story Above Grade, 3,190 SF Addition.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents