Similar Projects
Water Meter Transfer
Infrastructure
Bidding
Bowling Green, KY

Price Contract for Painters
Term Contract
Bidding
Bowling Green, KY

Verona Tank Rehabilitation
Post-Bid
Verona, KY 41092

Preston Highway Water System Improvements
Post-Bid
Lebanon Junction, KY 40150

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Emergency Replacement Water Transmission Main Crossing
Infrastructure
Bidding
Catlettsburg, KY

Carpeting, Flooring and Painting
Renovation
Post-Bid
Frankfort, KY 40601

Crowell Avenue and Eustace Avenue Water Main Replacement
Results
Fort Thomas, KY

Unit Painting/Cleaning Services
Term Contract
Post-Bid
Paducah, KY

Installation of Water Main Facilities Along Beechgrove Road and Big Jimmy Hill Road, Boone County
Results
Burlington, KY

Water System Improvements Ph 11 - Zone Meter & River Crossing Installation Re-Bid
Post-Bid
Irvine, KY

Greenup Street Water Main Connection
Results
Less than $52,015 est. value
Covington, KY 41018

Miscellaneous Water System Improvements - Rebid
Post-Bid
Paintsville, KY

Reported 11/18/2021 12:00 AM
Project Title

Waterline Extensions Contract 2 - Tank Rehab

Physical Address View project details and contacts
City, State (County) Jackson, KY   (Breathitt County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Painting, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of: Existing Tank Cleaning and Painting Clean out and dispose of any existing sediments. Complete repairs, surface preparation, clean and paint/finish the interior (wet surfaces) and exterior surfaces and piping of the tank, coat concrete foundation as needed for a complete and proper installation. Install Cathodic protection.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents