Similar Projects
Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Collegiate Village Development - Master Plan
New Construction
Conception
Orlando, FL 32817

MDM Boutique Hotel at Morse and Penn
New Construction - 115,646 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Winter Park, FL 32789

TownePlace Suites at Grand National
New Construction
Design
Orlando, FL 32819

Springhill Suites Lake Nona
New Construction - 93,000 SF
Construction
$14,090,400 est. value
Orlando, FL 32824

Sunbridge Mixed-Use Development Master Plan
New Construction
Construction
Orlando, FL

Evermore Orlando Resort - Master Plan
New Construction
Pending Verification
Orlando, FL 32836

AdventHealth Mixed-Use Campus - Master Plan
New Construction
Conception
Orlando, FL 32832

O-Town West Office Building and Zen Hotel
New Construction - 250,000 SF
Design
Orlando, FL 32825

Element Hotel by Westin
New Construction
Construction
$30,000,000 est. value
Orlando, FL 32819

Tru by Hilton Hotel
New Construction
Conception
Orlando, FL 32836

Comfort Inn - Mainstay Suites
New Construction - 75,000 SF
Design
Ocoee, FL 34761

Hilton Garden Inn at Apopka City Center
New Construction
Construction
$18,000,000 est. value
Apopka, FL 32703

3 Hotel/Motel Properties on Lake Cecil
Renovation, Demolition
Conception
Orlando, FL

WoodSpring Suites
New Construction - 51,048 SF
Design
$7,500,000 est. value
Orlando, FL 32826

Last Updated 09/21/2021 04:00 PM
Project Title

Lake Nona WAVE Hotel

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Construction Commenced July 2019, Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To include 12,000 SF of Meeting Space, WAVE Ballroom, 5,360 SF of event space, 3 Restaurants, Outdoor Garden

Details

1 Hotel/Motel, 17 Stories Above Grade, New Construction 239 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents