Similar Projects
The Link Apartments
New Construction
Conception
$80,000,000 est. value
Oakland, CA 94607

Affordable Micro Studios
Renovation - 320,000 SF
Conception
$18,500,000 est. value
Oakland, CA 94607

San Pablo Avenue Affordable Housing
New Construction - 27,000 SF
Design
Emeryville, CA 94608

2400 Adeline Condominium Development
New Construction - 45,750 SF
Design
$4,600,000 est. value
Oakland, CA 94607

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Hayward Maintenance Complex (Phase 2) Civil Grading
Infrastructure
Results
$20,000,000 to $40,000,000 est. value
Hayward, CA

The Launch Apartments
New Construction
Construction
$166,000,000 est. value
Alameda, CA 94501

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

500 Lake Park Mixed Use Development
New Construction - 3,000 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Oakland, CA 94610

Mixed-Use Building
New Construction - 57,600 SF
Pending Verification
$5,313,535 est. value
Berkeley, CA 94704

Downtown Oakland Housing Tower
Renovation
Conception
Oakland, CA 94612

Lake Merritt Bart Station
New Construction - 516,500 SF
Design
Oakland, CA 94607

Last Updated 09/28/2022 06:34 PM
Project Title

West Midway Project - City of Alameda

Physical Address View project details and contacts
City, State (County) Alameda, CA 94501   (Alameda County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $56,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 28, 2022, developers for this project have been identified. Construction is anticipated to begin in 2025 or 2026. *The previous solicitation is listed below for reference. --- The City seeks a qualified developer to form a public/private partnership with the City for a 22.8 acre residential mixed-use development in the Main Street Neighborhood at, Alameda Point, the former Naval Air Station Alameda and one of the most unique infill development opportunities in the country. The Site is just north of the first phase of the $1 billion mixed-use Site A development with 680 housing units, 93,000 square feet of retail and 8 acres of parks, open space and waterfront development. With close downtown San Francisco, a 20-minute ferry ride away, West Midway represents one of the most significant development opportunities in the country. Requests for Information (RFI's) are due by Thursday, September 6, 2018. The method of contractor selection has not been determined at this time.

Details

93,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents