Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

CHP Antelope Platform Scales (PS) Eastbound/Westbound - Monthly Parking Lot Sweeping Services.
Infrastructure
Post-Bid
Citrus Heights, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Power Inn Road Improvement Project
Infrastructure
Results
$3,208,000 est. value
Sacramento, CA 95811

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Victory Avenue Apartment / Flemings Highway Farms
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Sacramento, CA 95828

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Construction of Roadway Paving on Lytle Avenue from W. Cecil Way to County Line Road
Infrastructure
Results
$1,436,028 est. value
Delano, Sacramento, CA 95811

Last Updated 03/27/2023 03:13 PM
Project Title

Laguna Creek Inter-Regional Trail Crossing at State Route 99 Project - City of Elk Grove

Physical Address View project details and contacts
City, State (County) Elk Grove, CA 95624   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected March 2026 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $6,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 27, 2023, an engineering firm has been identified. This project is to receive $6.8 million in funding and construction is anticipated to begin in 2026. Closed solicitation has been included below for reference. ……………….. The City of Elk Grove (City) is accepting proposals from qualified Consultants (Consultant(s)) for Professional Engineering and Environmental Consulting Services (preliminary engineering, environmental documentation, and the preparation of final plans, specifications, and estimates package) for the Laguna Creek Inter-Regional Trail Crossing at State Route 99 Project, City Project # WTL016, Federal Project #:CML-5479(072) (Project). The selected Consultant shall provide professional engineering and environmental services necessary for the preparation of plans, technical specifications and estimate, including bid and award phase services, and design support during the construction phase, in accordance with the included specifications, terms, and conditions shown in this Request for Proposal (RFP). Prospective respondents are advised to read this information over carefully prior to submitting a proposal. This Project received Federal funds from the Congestion Mitigation and Air Quality (CMAQ) Program and the Active Transportation Program (ATP) and as such, this Project must comply with the Federal Highway Administration (FHWA), Caltrans requirements for federally funded projects pursuant to the latest Local Assistance Procedures Manual, and Capital Outlay Program Guidelines. The successful Consultant will enter into a consultant contract with the City of Elk Grove. Questions regarding this RFP are to be directed by e-mail to: Surjit Dhillon, Project Manager, sdhillon@elkgrovecity.org with a copy to Andrea Koerner, Administrative Analyst, akoerner@elkgrovecity.org. Such contact shall be for clarification purposes only. Written questions shall include the individual's name, address, and must reference this RFP in the title of the email. Questions via phone will not be responded to. The City must receive all questions no later than 5:00 p.m. on September 20th. Material changes, if any, to the scope of services or proposal procedures shall only be transmitted by written addendum and posted to the City web site. Addenda and answers to submitted questions will be available via the City of Elk Grove web site by clicking "Notice" under View Details/Documents for the RFP announcement. Addendum shall be acknowledged, signed and submitted with the proposal. Any proposal may be withdrawn or modified by a written request signed by the Consultant and received by the City Clerk prior to the final time and date for the receipt of proposals. Once the deadline is past, Consultants are obligated to fulfill the terms of their proposal. PROPOSAL CLARIFICATION POSTING September 22, 2022 ANTICIPATED INTERVIEW DATES** October 24 - 28, 2022 ANTICIPATED CONTRACT AWARD January 25, 2023 The method of contractor selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents